Client
Enermed Costruzioni S.r.l.
Project
Installation of supporting steel structures, assembly of equipment, and on-site testing at the electrical substation serving the wind farm comprising 20 wind turbines, with a total capacity of 40 MW, located in Rocchetta Sant’Antonio / Candela (FG), owned by Windstrom Energia Eolica S.r.l.
Project status
CompletedCompletion
2009
Business Area
Infrastructure
Working on innovative and highly complex projects means taking on stimulating challenges every day challenges that foster the rapid development of both technical and managerial skills. Within a solid and well-structured organization such as Guastamacchia S.p.A., where quality and sustainability guide every decision, professional growth becomes tangible and continuous, making the company a reference point for professionals in the industry.